Product / program / project management (P3M) view

Problem

  • clear high level view of P3M

  • can it be done with existing tool (JIRA) ?

  • talk to Susan

  • existing tool (JIRA) great for tactical view of the work stream (who’s doing what, when, how)

  • JIRA board typically organized by team

  • higher level view is ad-hoc or handled in completely different tools (roadmap hand-curated and stored in Powerpoint slides, for example)

  • disconnect between tactical and strategic views

Solutions

  • Use separate “project” for high-level features on the roadmap ?

See also