Product / program / project management (P3M) view
Problem
-
clear high level view of P3M
-
can it be done with existing tool (JIRA) ?
-
talk to Susan
-
existing tool (JIRA) great for tactical view of the work stream (who’s doing what, when, how)
-
JIRA board typically organized by team
-
higher level view is ad-hoc or handled in completely different tools (roadmap hand-curated and stored in Powerpoint slides, for example)
-
disconnect between tactical and strategic views
Solutions
- Use separate “project” for high-level features on the roadmap ?
See also
- use backlog wisely
- clear out old items
- triage old bugs https://lucasfcosta.com/2023/02/07/backlogs-are-useless.html